Go Green and Save Green!

When selecting finishes, select the RoHS compliant finishes. They are better for the environment and less expensive!

 

DA-4600 Line Receptacle Installation

Front Load:

Support Panel Preparation
Support Panel Installation Preparation Drawing
Installation Procedures:
Installation Procedure Drawing
  1. Place open end of top flange around the hole edge from above and angle the receptacle through the hole.
  2. Slide the receptacle back until the flange lip snaps into the hole.