Go Green and Save Green!

When selecting finishes, select the RoHS compliant finishes. They are better for the environment and less expensive!

 

DA-4600 Line Receptacle Installation

Back Load:

Support Panel Preparation
Support Panel Preparation Drawing
Installation Procedures
Installation Drawing
  1. Angle the long notched side of the top flange into the hole from the underside.
  2. Push the other long side completely through with a flat blade screwdriver.